The Greenhouse:
This was built by Mark Allen Jenefsky and advised
by Jens Pohl from 1983-1989. All of the elements of this have
not yet been completed, however, currently, it is a fairly standard
working greenhouse. The intention was to control ventilation and
water from campus but that didn't work out so far. Still to be
completed is the installation of the eutectic salt panels, an
automated watering system, an automated venting system, and more
plant beds. Once finished, the eutectic salt panels will absorb
the day's heat, and the material inside the panels will turn to
liquid. In the evening, the material will harden, giving off heat
in the process. This will stabilize the interior temperature.
|
|